There's no tearout and no new pour. We prepare the old surface, mix and spread the resurfacing compound, and you end up with a fresh-looking driveway or patio. If the concrete is sound underneath and only the surface is rough, resurfacing is usually the better choice over replacing the slab.
When resurfacing makes sense
Resurfacing only works on a solid slab. A crack that runs all the way through, or a section that has sunk and now tilts the wrong way, is a problem in the slab itself, and an overlay won't fix it. Surface wear and hairline cracking are what this work is for.
Driveways make up most of our resurfacing jobs. If you aren't sure your slab qualifies, we'll look at it and tell you whether an overlay will hold or whether the slab needs more work first.
Closely related: polished concrete floors. Want a concrete contractor in Kahului? Our main page lists everything.
Related reading: What Concrete Work Costs and What Moves the Price · Warning Signs You Need Concrete Work
Price
Concrete driveway resurfacing runs $4 to $11.50 a square foot. Call us with the rough size and condition and we can give you a typical range on the phone. We confirm the exact number after we see the slab.
The most work-intensive jobs land at the high end. More prep before the compound goes down means more labor. Size also counts, because a bigger surface is split into more sections, and each section is mixed, placed and finished separately.

How we do the work
Before any compound goes down, we wet the concrete with a hose. Then we use a long-handled industrial squeegee to clear the standing water, so the surface is damp but has no puddles when the overlay hits it.
We mix the compound in 5-gallon buckets and lay it in sections no larger than 144 square feet. That size lets us finish each batch while it's still workable. We plan the sections around the slab's control and expansion joints and keep compound out of those joints completely. Those joints are where the slab moves, and an overlay bridging them would crack along the same line. A larger driveway means more sections, so it takes longer from start to finish.
Kahului has no heating season, so frost doesn't affect how or when we schedule the work.
Permits
Before we start, we go through the county's permit process for your address and tell you what applies to your job.
Details of the Work
Spelled out, the work covers:
- Pour the mixture onto the concrete and use a long-handled squeegee to spread it, scrubbing the material into the surface.
- For a slip-resistant finish, broom the surface within five minutes, using full strokes across the work section.
Straight Answers
A conversation on the phone is the easiest start, asking is free.
