How we build a walkway
We lay out the path with mason's string and stakes, so you can see exactly where the edges will run before any ground comes out. Turf comes up with a sod cutter. Tight spots along beds, steps and fence lines get cleared with a shovel. Once the forms are set, we dampen the gravel base. The base should be wet enough that it won't pull water out of the fresh concrete, but there should be no standing water under the pour. Then the concrete goes in and gets spread within the forms. We screed it to the profile we planned, float the surface, and run an edger along the forms so the finished edges are rounded instead of sharp.
Many projects also need concrete slab and foundation installation. Shopping for a concrete contractor in Kahului? Our home page has more.
More answers: What Concrete Work Costs and What Moves the Price · Warning Signs You Need Concrete Work
What a walkway costs
A standard-finish concrete walkway or sidewalk runs about $10.50 to $15.50 per square foot. Tell us roughly how long and wide your path is on the call, and we'll work out a typical range for it right then. The firm figure comes once we've walked the path in person. Where your job falls in that range depends mostly on how much ground has to come out and how easy the path is to reach.

Scheduling around the rain
Around 21.7 inches fall on Kahului in a typical year, mostly during the rainy season. January is the wettest month at around 3.6 inches. June is the driest at around 0.6. Because the base has to be damp with no standing water when the concrete goes in, we pick pour days around the forecast. Pours in the drier months are easier to book. A winter job can still happen, but plan on some give in the date.
Low ground and flood-prone streets
Heavy rain floods parts of Kahului again and again, especially along Kaʻahumanu and Puʻunene avenues and as far south as Wakea Avenue. The ground right on the harbor doesn't behave like inland lots, so we don't treat one like the other. If your walkway is in one of these spots, we look at how water sits on your site before we set the forms. We also leave extra room in the schedule after a storm so the base isn't sitting in water on pour day.
What Goes Into the Work
In detail, it tends to involve:
- Stake out the walkway, run mason’s string to mark its edges, and set the intended slope.
- Remove sod and excavate the path to accommodate the concrete and subbase.
What to Expect to Pay
These ranges are here to help you budget, and your written quote is the number that counts.
$10.50–$15.50 per sq. ft.
Example: about $1,050–$1,550 for 100 sq ft
$11.50–$17.00 per sq. ft.
Example: about $1,150–$1,700 for 100 sq ft
$1,800–$4,400