It isn't a patio or a driveway. It's load-bearing work, reinforced to carry the walls, the roof and everything inside. In Kahului we pour foundations for new homes and for additions. Our crew carries it from the forms to the finished slope around the house, and the first phone call is enough to talk through a typical price range.
When a foundation is the job
Most of our foundation calls come from someone building new who needs the base poured before the framers arrive. The other common one is an addition, where the new room needs its own foundation tied into the plan. Either way, the foundation can't be redone later without tearing out everything built on top of it, so we treat the forming, reinforcement and pour as the part of the project that gets no shortcuts.
A common next step is concrete resurfacing. Need a concrete contractor in Kahului for another job? Start on our home page.
Helpful next: What Happens During Concrete Work: The Steps Explained · Hiring a Concrete Contractor: Questions Worth Asking First
What goes into the foundation
Under the concrete is a compacted gravel subbase, and footing rebar runs through the footings to carry the load. We build the forms to the dimensions and grade on your plans, then pour into them. Our quote lists each piece: excavation where needed, the gravel subbase, the footing rebar, forming, the pour, curing, and the backfill and grading once the foundation is complete.
Maui County builds to the 2018 International Residential Code with state amendments, and the county lists its own residential amendments as still to be determined. We check the county's current posted requirements when we put your job together, so the plans and the work line up with what's in force when you build.

Pouring and curing
We place the concrete inside the forms and strike it off to the required grade with a screed, which sets the surface at the exact height the plans call for. Then we bull-float it to close up the surface and leave it flat for finishing. After that the concrete cures before anything goes on top of it. Kahului temperatures run from January lows in the mid-60s to July highs in the mid-80s, so there's no cold season to work around. We still give the cure its full time before the next trade starts building. Total days on site depend on the footprint and the lot, and the timeline is written into the quote.
Backfill and grading
Once the foundation is complete and cured, we backfill the gap between the excavation and the foundation where the design calls for it. Then we grade the ground so it slopes away from the house. Kahului is hot and semi-arid most of the year, but most of the rain comes in winter. That slope sends winter runoff away from the foundation instead of letting it sit against the wall.
What it costs
Stem-wall foundation installation runs $8 to $25 per square foot. Give us the footprint over the phone and we'll say roughly where in that range your job should land. The firm number comes after we've walked the site and read the plans. The things that move the price within that range are the size of the footprint, the footing depth and amount of rebar the plans call for, and how much gravel subbase the ground needs before we form.
Getting started
If you're planning a new home or an addition in Kahului, call us with your plans or the rough size of the footprint. We'll give you a range on the call, then walk the site and put the full scope in writing, from subbase to final grade.
Typical Kahului Pricing
Plan around these figures, and we'll explain what moves a price up or down.
$8–$18 per sq. ft.
$5–$25 per sq. ft.
$8–$15.50 per sq. ft.